• <dd id="hkwef"></dd>

    <div id="hkwef"><label id="hkwef"></label></div>
  • <b id="hkwef"></b>
  • A good start to the new year! Another bid for Ningbo Rail Transit City Line Project

    Time : 2023-01-05

    At the beginning of the new year, Longyuan Construction Group welcomed the bid"A good start": the joint venture between the company and Sinohydro Bureau 11 Co., Ltd. is the Ningbo to Cixi (suburban) railway projectSGCX0threeThe bid winner of the bid section construction project, and the bid winning amountten point five twoRMBten0mn This is Longyuan Construction Grouptwo thousand and twenty-twoAt the end of the year, we won the bid for Ningxiang RailwaySGXS01After the construction of the bid section, it will be "the next city" on the Ningbo rail transit city line project.

    Ningbo - Cixi City (Suburb) Railway"Ningci Line"), as Ningbo Rail TransittenLine 1, as the north wing skeleton line of Ningbo rail transit network, undertakes the medium and long distance travel from the central urban area of Ningbo to the northern sub-city and the internal commuter travel between cities and towns along the line. The line starts at Kongpu Station in Jiangbei District and ends at Cixi High-speed Railway Station. It passes through the new Ningbo North, Zhenhai, Longshan, Zhangqi, Guanhaiwei, Fuhai and Kandun, and connects with the subwaytwoLinefiveLinethreeLinesevenTransfer to Line No. The total length of the line is aboutsixty-fourKm, the length of underground line is about1seven.fiveKm, with 12 stations, with an average distance of aboutsixKm, including underground stationsfiveAll are transfer stations. One depot is set at the north end of Cixi high-speed railway station and one parking lot is set at Longshan.


    The Group and Sinohydro Bureau 11 Co., Ltd. formed a consortium to win the bidSGCX0threeLot construction project, including Xincheng Avenue Station(Excluding)-Open cut section and section bridge of University Town Station, University Town Station, University Town Station-Double attached station(Excluding)Civil and structural works and electromechanical installation of section bridges(Excluding系統(tǒng)工程)Cooperate with decoration works, rainwater and sewage pipe relocation and other pipeline relocation, road restoration, sound barrier and other supporting works. The company is responsible for completing the total output value as the leaderfive0%Construction content: the 11th Bureau of Water and Electricity is responsible forfive0%The total construction period is about four years, and it is planned totwo0two6It will be completed and opened to traffic at the end of the year.

    In recent years, Longyuan Construction Group has deeply cultivated the main track of urban development and attached great importance to the development of Ningbo rail transit construction marketfourCivil works of LineTJfour01sevenSince the bid section (Dongqianhu Station), a total of five Ningbo rail transit projects have been awarded, with the bid winning amount oftwo6.sevensevenRMB100mn

    In the new year, Longyuan Construction Group will seize the momentum and make further efforts to steadily promote the high-quality development of the enterprise.

    97免费公开福利无码视频,午夜免费人成视频在线,欧美日韩国产在线精品特黄,香蕉视频aaa在线观看
  • <dd id="hkwef"></dd>

    <div id="hkwef"><label id="hkwef"></label></div>
  • <b id="hkwef"></b>
  • 国产美女遭强高潮开双腿| 亚洲成av人无码不卡影| 欧美日韩一区二区线看免费| 人妻久久无码精品| 国产亚洲aⅴ在线电影91| 国内精品久久久久精免费| 色婷婷五月亚洲大全| av男人的天堂在线观看国产| 国产AV人人夜夜澡人人爽软件| 久久婷婷色综合网站| 精品无码特级毛片| 日韩中文字幕精品一区| 中文字幕丝袜精品久久| 亚洲国产成人av手机在线观看| 黄片中文字幕在线免费看| 国产午夜免费高清视频| 人妻精品久久久久中文字幕偷| 亚洲爽爆在线观看白浆| 人妻中文无码不卡免费中出| 亚欧无码视频在线播放| 亚洲天堂在线视频|